Enercon has signed a contract with the Austrian utility Energie Burgenland to supply 51 wind energy converters with a total capacity of 212MW.
The Enercon wind energy converters in different performance classes are to be installed in seven wind farms planned for Burgenland. Construction of the majority of the projects resulting from this cooperation is scheduled to start this summer. eologix sensor technology will equip all wind turbines with their eologix:safe system.
eologix:safe signals a safety relevant stop due to icing on the blades. With the system it is possible to detect icing on specific spots on the blade and measure the ice thickness and the surface temperature.
eologix:safe signals a safety relevant stop due to icing on the blades. With the system it is possible to detect icing on specific spots on the blade and measure the ice thickness and the surface temperature.