
Windpark Krammer consists of 34 Enercon E-115 wind turbines (3 MW capacity and 122 metres hub height) and was commissioned in March 2019. 60% of the wind farm is owned by two cooperatives, Deltawind and Zeeuwind (DZH), which regroup around 5,000 members. Kallista Energy acquires the shares that were held by Enercon.