
The contract, lasting approximately two years, includes the planning of upcoming offshore geotechnical site investigations in DDWWFZ, the development of a fully integrated ground model (IGM) for the entire investigation area, and the preparation of a geotechnical interpretative report (GIR). The aim of the project is to prepare, interpret, and integrate marine exploration data to enable potential investors to assess the cable, layout, and foundation conditions within the DDWWFZ, and assist their preparation and submission of bids within the offshore wind farm zone.
Image © RVO