Goldwind USA was recently informed by the Illinois Power Agency (IPA) that it had been selected to provide energy from the 106.5MW Shady Oaks project in Lee County, Illinois.
As part of the successful bid, Goldwind will now acquire the project from Mainstream Renewable Power with whom they partnered to participate in the IPA’s competitive process. The project will be governed by a 20 year renewable energy offtake agreement from ComEd through the Illinois Power Agency’s long term procurement plan. Mainstream will continue to play a central role in the project through the development and construction stages to assist Goldwind in delivering the project through to commercial operation. The Shady Oaks project will feature 71 of Goldwind’s 1.5MW Permanent Magnet Direct Drive (PMDD) turbines.
As part of the successful bid, Goldwind will now acquire the project from Mainstream Renewable Power with whom they partnered to participate in the IPA’s competitive process. The project will be governed by a 20 year renewable energy offtake agreement from ComEd through the Illinois Power Agency’s long term procurement plan. Mainstream will continue to play a central role in the project through the development and construction stages to assist Goldwind in delivering the project through to commercial operation. The Shady Oaks project will feature 71 of Goldwind’s 1.5MW Permanent Magnet Direct Drive (PMDD) turbines.