Turbine installation has been completed at the 476 MW Baltic Eagle offshore wind farm, a joint venture between Iberdrola and Masdar. The 50 installed wind turbines, each with a unit capacity of 9.53 MW, were supplied by Vestas and installed by Fred Olsen Windcarrier.
Baltic Eagle is the second of Iberdrola's three wind farm projects in Germany, along with Wikinger (350 MW, in operation) and Windanker (315 MW, in planning). Collectively, these offshore wind farms form Iberdrola's Baltic Hub. By 2026, Iberdrola’s Baltic Hub will have a total capacity of more than 1.1 GW. Baltic Eagle is Masdar’s first project with Iberdrola and its first in Germany.