Iberdrola has signed a power purchase agreement (PPA) with Agrati Group, a specialist in fastening systems and mechanical components. From 2025, Agrati will purchase all electricity generated by the Florembeau wind farm in Créquy, Pas-de-Calais, France.
The wind farm consists of five turbines with a total capacity of 10.25 MW and an annual output of 21 GWh. This renewable energy will supply three Agrati production sites in Fourmies, Vieux-Condé (Nord-Pas-de-Calais), and Avressieux (Savoie), covering 53% of their annual electricity needs of 38 GWh.