Floatgen, the 2 MW floating wind turbine, installed at the Sem-Rev test site (off Le Croisic), produced 14% more power in 2020 than in 2019, reaching an annual total of 6.8 GWh.
Further Ideol has confirmed its partnership with Ecole Centrale de Nantes, which operates SEM-REV, the site on which Floatgen is installed, and signed an agreement which extends the operation of the floating wind turbine by 3 years. These 3 additional years will allow Ideol to pursue its research activities.