James Fisher Renewables (JF Renewables) has announced they are working with Ho Lung Power Engineering (HLPE) to provide planning, reporting, engineering support / technical review and skilled labour for cable termination and testing (T&T) of Ørsted’s Greater Changhua wind farm in the Taiwan Strait.
Technical support began in June which included an assessment of team structure and task timings, logistical planning support, progress rate calculations, fibre optic (FO) installation support, interface management and operational efficiency analysis. Offshore operations include T&T consultancy and service on 66kV inter array cables. Additional work scope includes FO and electrical testing pre and post installation which began in July.