Latest Issue
 
Windtech International September October 2024 issue

 

FOLLOW US AT

follow

 

follow


Neoen has chosen QOS Energy’s O&M management platform to monitor the performance of the 315MW Hornsdale wind project. The project, consisting of 96 Siemens 3.2MW wind turbines, is being built in three stages; two of which have been completed.

Neoen has deployed Qantum to monitor the two first stages of the project. No additional hardware or system installation is required onsite to run the software. The platform gathers and analyses data generated by each turbine for all measured values using a secure VPN connection. Qantum® is compatible with every kind of wind turbine, communication standard or database connection protocol. Neoen can customise operating dashboards, analysis, KPIs, alerts, reports or contracts depending on their specific needs. The engineering team of QOS Energy has delivered bespoke performance indicators and KPIs for the whole wind farm, and custom operating dashboards have been delivered for each user type.

 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.