Nexans has announced the finalisation of a contract with Ørsted and Eversource to supply the export cable system for the Revolution Wind Farm.
Located more than 15 miles south of the Rhode Island coast and 32 miles east of the Connecticut coast, the project will connect the wind farm to the onshore grid. Local construction will begin in 2023 and the project is expected to be fully operational in 2025.