Finnish Investment company Taaleritehdas has placed another order with Nordex for a further 19 N117/2400 turbines, which are to be supplied for the Myllykangas wind farm on the northwest coast of Finland.
This marks Taaleritehdas’ third calldown under the frame contract, which was signed in 2012 for a total of up to 111 turbines. Nordex will also be providing service for the 19 turbines under the current calldown from the joint service point in Kempele. With a nominal output of 2.4MW each and a hub height of 120 meters, the turbines will be supplied in the cold-climate version from autumn 2014 and are scheduled to be connected to the grid in 2015.