The Nordex Group will supply and install 15 N131/3900 turbines for the 58.5MW Mierzyn wind farm for the subsidiary of the Polish utility Tauron Polska Energia - Tauron Zielona Energia.
The order also includes service for the turbines covering a period of three years. The wind farm is being built in the north-west of Poland. The N131/3900-turbines will be installed by the Nordex Group as of autumn 2023 on tubular steel towers with a hub height of 134 metres. Commissioning is scheduled for summer 2024.