Nordex will supply and install turbines for the Brazilian wind farm Lagoa dos Ventos with a capacity of around 595MW for Enel Green Power. The project is composed of 191 AW125 turbines.
With an installed capacity of 3.15 or 3.0MW, the turbines will be mounted on top of 120-meter concrete towers which the group will be producing locally at its own plant in Brazil. The wind farm is located in the state of Piaui in the north of Brazil. The Nordex Group will commence work on installing the wind farms from October 2019, subsequently providing service for the turbines for at least two years.