Jan De Nul Group has signed a engineering, procurement, construction and installation (EPCI) contract for constructing Northwester 2, the seventh wind farm off the Belgian coast, with wind farm developer Parkwind.
Jan De Nul will be responsible for the design, construction and installation of 23 foundations, the transportation and installation of the cables and the transportation and installation of the wind turbines on top of the foundations.The Northwester 2 wind farm is located 48 kilometres off the coast and will consist of 23 MHI Vestas V164-9.5MW wind turbines with a rotor diameter of 164 metres.