The Swedish wind farm developer OX2 has placed an order with the Nordex Group for the supply of eleven N149/5.X turbines for the Wysoka wind farm in Poland.
The order also includes a service agreement for the turbines covering a period of 30 years. The 63 MW Wysoka wind farm will be built some 125 kilometres to the south-east of Koszalin in the north-west of Poland. The Nordex Group will supply the N149/5.X turbines on tubular steel towers with hub heights of 125 metres. Installation of the turbines is due to begin mid-2023 with commissioning following in 2024. OX2 will then take over technical and operational management of the wind farm for the owner, the Ingka Group.