Nordex has been awarded a contract by project developer ABO Wind for the construction of a further two wind farms. Located in the German regions of Central Hesse and Franconia, the planned farms will be going on grid this year after the project finance has been finalised.
With two wind farms already under construction and also located in Central Hesse and Franconia, the project volume being jointly executed by Nordex and ABO Wind will thus rise to 51.2MW this year. In awarding these contracts, ABO Wind has opted for solutions which Nordex has specifically developed for non-coastal regions characterised by weaker winds. The project comprises eight N100/2500 and 13 N117/2400 turbines.. As part of the wind farms will be located in forests, hybrid towers with an above-average height of 141 meters are being used in all projects to optimise energy yield.
With two wind farms already under construction and also located in Central Hesse and Franconia, the project volume being jointly executed by Nordex and ABO Wind will thus rise to 51.2MW this year. In awarding these contracts, ABO Wind has opted for solutions which Nordex has specifically developed for non-coastal regions characterised by weaker winds. The project comprises eight N100/2500 and 13 N117/2400 turbines.. As part of the wind farms will be located in forests, hybrid towers with an above-average height of 141 meters are being used in all projects to optimise energy yield.