Natural Power have delivered an energy yield study on the proposed wind turbine project Beltonanean in Northern Ireland for Graham Bell.
Natural Power’s input will assist the client in assessing the financial viability of the project, with the ultimate goal of assisting the client to secure finance on the site. The process included on-site data processing, long-term resource analysis, flow and energy yield modelling and uncertainty analysis. The proposed turbine location is in non-complex terrain and the industry standard Wind Atlas Analysis and Application flow modelling software (WAsP) was used to predict wind speeds at the turbine location, based on nearby mast data.
Natural Power’s input will assist the client in assessing the financial viability of the project, with the ultimate goal of assisting the client to secure finance on the site. The process included on-site data processing, long-term resource analysis, flow and energy yield modelling and uncertainty analysis. The proposed turbine location is in non-complex terrain and the industry standard Wind Atlas Analysis and Application flow modelling software (WAsP) was used to predict wind speeds at the turbine location, based on nearby mast data.