Nordex has secured orders for two wind farms in the South West of Ireland totalling 42.5MW, which will enter full operation in summer 2017. Both orders include a 15 year Premium full-service contract.
The Killaveenoge Wind Farm near Drinagh in County Cork will feature ten N90/2500 turbines with a 125 metre tip height for a local Irish developer. Turbine delivery is scheduled for October 2016. The seven turbine Coollegrean Wind farm near Brosna in County Kerry for Element Power will also feature N90/2500 turbines but with a 115 metre tip height. Turbine delivery is scheduled for November 2016.