
The financing facility was jointly arranged by MUFG Bank, Ltd., Sumitomo Mitsui Banking Corporation, Sumitomo Mitsui Trust Bank, Limited, Mizuho Bank, Ltd., Development Bank of Japan Inc., Societe Generale, and Shinsei Bank, Limited.
The Ishikari Offshore Wind will utilise 14 Siemens Gamesa 8.0 MW wind turbines. The offshore wind project, and accompanying battery storage component, is expected to reach commercial operation in December of 2023. The project has a 20-year power purchase agreement with Hokkaido Electric Power Network, Inc. for 100% of the power output.