Seaproof Solutions has been awarded a contract to supply its cable protection system (CPS) for DONG Energy’s 1.2GW Hornsea Project One offshore wind farm in the UK.
The contract covers the design and supply of 248 cable protection systems for the inner array grid submarine cables.