DEME Offshore US will deploy the HC1100 during the installation of the Vineyard Wind offshore wind project. The HC1100 will be used to transfer wind turbine components to and from heaving supply vessels. As a Balanced Heave Compensator (BHC), it can compensate a vessel’s heave motions and quick-lift loads up to 1100mT, and is battery powered.
Seaqualize signs contract for first offshore wind feeder barge operations in the USA
- Category: Projects and Contracts