Siemens Gamesa, Arise and Foresight Group will collaborate for the Kölvallen project in Sweden. The project will be acquired by Foresight Energy Infrastructure Partners, Foresight Group’s flagship energy transition fund.
The 277-MW Kölvallen project is due to be installed in early 2025, and will feature 41 units of the SG 6.6-170 model and one SG 6.6-155. The contract also includes a 35-year service contract. The turbines will sit on towers of 135 meters for the SG 6.6-170 turbines, and on a 122.5-meter tower for the SG 6.6-155 version.