Siemens Gamesa has reached an agreement with local developer for the supply of 103 of its G126-2.5 MW turbines (260 MW) at the Hanuman wind complex, being built in the province of Chaiyaphum, in northeast Thailand.
With a tower height of 153 metres and a blade length of 62 metres, the turbines will stretch 215 metres tall. The turbines will be delivered in May 2018 and commissioned towards the end of that year. The company will also operate and maintain the facility.