Siemens Gamesa has signed a 150 MW agreement with Elawan Energy to supply 30 SG 5.0-145 model turbines. The wind complex, formed by three wind farms in the same area – Fuente Álamo, Frontones and Derramador, with 50 MW each - is located in central Spain, in the province of Albacete, and is scheduled to be commissioned in mid-2022.
The contract with Elawan also includes a long-term service agreement for a period of 20 years. The 30 nacelles will be assembled at Siemens Gamesa's plant in Ágreda (Soria), the gearboxes will be produced at the plants in Asteasu (Guipúzcoa), Lerma (Burgos) and the city of Burgos, and the electrical components will be produced at the factories in Reinosa (Cantabria), San Fernando de Henares (Madrid) and Benisanó (Valencia).