Maersk Supply Service has been awarded the contract for the mooring system installation of the Saitec Offshore DemoSATH floating wind project. The project team is now being assembled to prepare for the imminent offshore installation in Q2 2022.
Maersk Supply Service is contracted by Saitec Offshore Technologies, the Spanish engineering company behind the development of SATH Technology. This is based on a concrete platform concept with a plug-and-play Single Point Mooring. This anchoring system allows an easy connection so the platform can be disconnected and taken ashore for O&M. The platform can rotate freely around this single point like a weathervane, reducing the environmental forces on the platform. It also helps the yaw control of the turbine to orientate the rotor plane against the wind. The DemoSATH project will use a 2MW turbine in a full scale prototype that will be deployed offshore Bilbao and will be the first floating turbine connected to the Spanish grid. This project is part-financed by RWE Renewables.