The wind farm, which is being developed in Jerez de la Frontera (Cadiz), will be equipped with 11 of the firm's G114-2.625 MW turbines for total capacity of close to 29MW.
Siemens Gamesa has also been engaged to operate and maintain the facility for five years. The wind farm is due to come on-stream towards the end of this year.