Latest Issue
 
Windtech International November December 2024 issue

 

FOLLOW US AT

follow

 

follow


Falck Renewables, through its Swedish subsidiaries, has awarded the Nordex Group two contracts to supply in total 31 N131/3900 wind turbines and the associated civil and electrical infrastructure works on an EPC turn-key basis for the two Swedish projects Aliden and Brattmyrliden.

Preliminary works have started with activity intensifying during 2018 and 2019 respectively. Commercial operations are expected in Q4 2019 at Aliden and Q4 2020 at Brattmyrliden. The two wind farms are located in Västerbotten, around 100 kilometres west of Umea. The turbines have a maximum rated capacity of 3.9MW each and are on 134-metre towers with NR65.5 blades. The turbines are equipped with cold climate packages with the Nordex Anti-icing System installed on the rotor blades.

 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.