Falck Renewables, through its Swedish subsidiaries, has awarded the Nordex Group two contracts to supply in total 31 N131/3900 wind turbines and the associated civil and electrical infrastructure works on an EPC turn-key basis for the two Swedish projects Aliden and Brattmyrliden.
Preliminary works have started with activity intensifying during 2018 and 2019 respectively. Commercial operations are expected in Q4 2019 at Aliden and Q4 2020 at Brattmyrliden. The two wind farms are located in Västerbotten, around 100 kilometres west of Umea. The turbines have a maximum rated capacity of 3.9MW each and are on 134-metre towers with NR65.5 blades. The turbines are equipped with cold climate packages with the Nordex Anti-icing System installed on the rotor blades.