Suzlon Group has announced that it has received an order for its 3MW wind turbines to develop a 300MW wind power project for Torrent Power Limited.
Suzlon will install 100 wind turbine generators (WTGs) with a Hybrid Lattice Tubular (HLT) tower and a rated capacity of 3 MW each. The project is located in Karnataka, India and is expected to be commissioned in 2025.