The African Development Bank has signed a contract to give Ketraco a partial risk guarantee to build a transmission line that will connect the Lake Turkana wind farm in Kenya to the grid. The 310MW wind farm is expected to begin generating power in 2017.
Transmission line for Kenyan wind farm secures financing
- Category: Projects and Contracts