Trelleborg’s applied technologies operation has been awarded a contract by Ørsted to provide four integrated cable protection systems for Hornsea Two offshore windfarm.
Trelleborg’s NjordGuard cable protection system will be used to protect the inter array power cables from fatigue, over-bending and abrasion, at the entry point of the monopiles. Design, testing and manufacture of the NjordGuard cable protection system will take place in Trelleborg’s manufacturing facility in the North of England. Project engineering works will commence immediately, with installation activities scheduled for execution in 2021.