Latest Issue
 
Windtech International September October 2024 issue

 

FOLLOW US AT

follow

 

follow


Vard 4 19 and Vard 4 12 for North Star RenewablesVard has announced that it has secured a new contract for the design and construction of a Service Operation Vessels (SOV) for North Star Group in the UK. The vessel of Vard 4 12 design will be the fourth SOV to be delivered from Vard to North Star for operation on the Dogger Bank Wind Farm in the North Sea.
 
The Vard 4 12 design is developed by Vard Design in Ålesund. The SOV for North Star has been developed to handle corrective maintenance services on the Dogger Bank C wind arrays. The vessel will have a height-adjustable, motion-compensated gangway with elevator system, a height-adjustable boat transfer system, as well as a 3D-compensated crane for cargo transfer. The new SOV will be 78 metres in length with a beam of 19 metres and have an accommodation for 60 persons in single cabins. The hybrid vessel will be equipped with a diesel-electric propulsion system. The SOV is scheduled for delivery from Vard’s shipyard Vard Vung Tau in Vietnam in 2024. Dogger Bank is currently under construction by joint-venture partners SSE Renewables, Equinor and Eni and when completed will be the world’s largest offshore wind farm.
 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.