Vestas and DONG Energy have entered into cooperation on testing of Vestas’ new V164-7.0MW offshore wind turbine at DONG Energy’s demonstration site in the waters off Frederikshavn.
Vestas will be supplying a V164-7.0MW turbine, which is a dedicated offshore wind turbine designed specifically for the harsh conditions at sea. DONG Energy’s total investment in the establishment of the test site will amount to around DKK 240 million. The V164-7.0 MW turbine is scheduled for installation in 2013 at the demonstration site, where DONG Energy has permission to install a total of six demonstration turbines. As part of the demonstration, DONG Energy and Vestas will cooperate on a technical due diligence of the V164-7.0 MW turbine.
Vestas will be supplying a V164-7.0MW turbine, which is a dedicated offshore wind turbine designed specifically for the harsh conditions at sea. DONG Energy’s total investment in the establishment of the test site will amount to around DKK 240 million. The V164-7.0 MW turbine is scheduled for installation in 2013 at the demonstration site, where DONG Energy has permission to install a total of six demonstration turbines. As part of the demonstration, DONG Energy and Vestas will cooperate on a technical due diligence of the V164-7.0 MW turbine.