Statoil and Statkraft have acquired the Dudgeon Offshore Wind Farm project through the acquisition of all shares in Dudgeon Offshore Wind Limited (DOW), a subsidiary of the UK energy company Warwick Energy Limited.
Dudgeon has recently received an offshore consent that allows for up to 560 MW of installed generation capacity. Statoil and Statkraft will optimize the project, secure the final consents and engage with suppliers and local stakeholders with the aim of bringing the project to Final Investment Decision (FID). The project will be developed by a joint project team, with Statoil leading the project towards FID. Statoil will hold a 70% share and Statkraft a 30% share in DOW.
Dudgeon has recently received an offshore consent that allows for up to 560 MW of installed generation capacity. Statoil and Statkraft will optimize the project, secure the final consents and engage with suppliers and local stakeholders with the aim of bringing the project to Final Investment Decision (FID). The project will be developed by a joint project team, with Statoil leading the project towards FID. Statoil will hold a 70% share and Statkraft a 30% share in DOW.