Latest Issue
 
Windtech International September October 2024 issue

 

FOLLOW US AT

follow

 

follow


hywind tampenEquinor and partners at Gullfaks and Snorre have decided to explore the possibilities of supplying the Gullfaks and Snorre fields with power from floating offshore wind. This could be the first time an offshore wind farm is directly connected to oil and gas platforms.
 
Equinor has performed a study evaluating which oil and gas installations on the Norwegian continental shelf (NCS) are suited for power supply from a floating offshore wind farm. The Snorre and Gullfaks fields in the Tampen area in the northern North Sea are the best match for realising this idea. The solution to be further explored is a wind farm consisting of 11 wind turbines based on Equinor’s floating offshore wind concept, Hywind. The 8 MW turbines will have a combined capacity of 88 MW, and are estimated to meet about 35% of the annual power demand of the five Snorre A and B, and Gullfaks A, B and C platforms. The seven Snorre and Gullfaks partners in the Tampen area in the North Sea will now mature the project towards a possible investment decision in 2019.
 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.