Latest Issue
 
Windtech International November December 2024 issue

 

FOLLOW US AT

follow

 

follow


WindFloat Atlantic, a 25MW floating wind farm to be installed off the coast of Portugal, will be the world’s first commercial floating offshore wind project operating at 66 kilovolt (kV).
 
The WindFloat Atlantic project, due online in 2019, will feature three MHI Vestas V164-8.4MW turbines installed on ballasted, triangular, semi-submersible foundations. The project will run at 66 kV and Nexans has been selected to supply its Windlink pre-terminated factory-tested cable system which provides a flexible connection inside the turbine between the transformer and switchgear. In addition, JDR has selected Nexans to supply the 66 kV T-connectors that will provide the connection for the phase cores of the dynamic 66 kV floating wind inter-array cables that JDR is supplying.
 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.