Latest Issue
 
Windtech International November December 2024 issue

 

FOLLOW US AT

follow

 

follow


Gamesa has announced the launch of a new wind turbine: the G114-2.0 MW Class IIIA, designed to achieve maximum returns from low-wind sites.

The G114 turbine, with unit capacity of 2.0MW, features a  114-metre diameter rotor with a swept area of 10,207 m² that increases a 38-per cent in swept area plus a 20-percent increase in annual energy output compared with the G97-2.0MW turbine. The new blade, spanning 55.5 metres with aerodynamic features also enables maximum energy production with reduced noise output levels. The machine offers a range of tower height options (from 93m to 140m or higher, depending on the target location).Gamesa will begin manufacturing initial prototypes of the G114-2.0 MW in the third quarter of 2013, with the first turbines supply to begin at the end of the same year. From 2014, the company will start manufacturing market-ready series in all of the regions in which it has a manufacturing presence.
 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.