A2SEA has signed a contract with DONG Energy to install 97 turbines for Gode Wind 1 & 2 in the German part of the North Sea.
In the first half of 2015, A2SEA will start installation of a total of 97 turbines from Siemens, each of 6MW/154m rotor, with a total capacity of 582MW. A2SEA will deploy their second generation offshore installation vessel Sea Installer on Gode Wind 1 (330MW) and Gode Wind 2 (252MW). Gode Wind 1 & 2 are expected to be fully commissioned in the second half of 2016.