
The two sub-projects, with a total capacity of 186 MW, will generate approximately 600,000 MWh of clean energy annually. The Dargikowo wind field includes 43 wind turbines with a capacity of 133 MW, while 16 turbines with a capacity of 53 MW generate electricity at the Karlino wind field.