![Picture (from left to right): Christoph Sowa (ENERTRAG, Head of Department Poland), Jörg Müller (ENERTRAG, Chairman of the Supervisory Board), Jacek Smolinski (Wójt/Mayor of the rural municipality Bialogard), Waldemar Misko (Mayor Karlino), Robert Falana (Mayor of Tychowo), Georg Kerschensteiner (Allianz) ENERTRAG Dunowo 2](/images/stories/News/News2022/ENERTRAG_Dunowo_2.jpg)
The two sub-projects, with a total capacity of 186 MW, will generate approximately 600,000 MWh of clean energy annually. The Dargikowo wind field includes 43 wind turbines with a capacity of 133 MW, while 16 turbines with a capacity of 53 MW generate electricity at the Karlino wind field.