Technical advisors Green Trust and Blix have assisted the listed infrastructure investor Tinc (Belgium) with the acquisition of the Kroningswind onshore wind farm on Goeree-Overflakkee, The Netherlands.
It concerns 19 wind turbine positions, for which land position rights, permits and an SDE + (Stimulation of Sustainable Energy Production) decision have been obtained. The intended capacity is around 80MW. Green Trust and BLIX have been appointed to provide TINC with further technical support in the realisation of the wind farm.