Installation of all 80 offshore wind turbines for the 480MW Saint Nazaire offshore wind farm off the west coast of France has been completed.
The wind farm utilises GE’s Haliade 150-6 MW turbines and is developed by EDF Renewables and Enbridge. Jan De Nul’s jack-up vessel Vole au vent installed the turbines. The offshore wind farm is scheduled to be operational by the end of the year.