Fugro UST21 has completed offshore geotechnical site investigations for Ørsted’s 1.4 GW Incheon offshore wind project, located about 70 km off the coast of Incheon, South Korea. The work was finalised in early August 2025.
Fugro’s Geo-data will support the design of turbine foundations and cable routes across the full development area. The scope of work included marine geotechnical services such as seabed cone penetration testing, downhole sampling, pressure metre testing, and laboratory analysis.