Jan De Nul Group will mobilise its jack-up installation vessel Taillevent for the installation of all 32 wind turbines for the Trianel Wind Farm Borkum II (TWB2) in the German North Sea. The start-up of installation is foreseen mid-July 2019.
Jack-up installation vessel Taillevent drafted for installation works at Trianel Wind Farm Borkum II
- Category: Projects and Contracts