Gamesa has closed the sale of two wind farms located in Germany, with aggregate installed capacity of 18.5MW, to HT Aiwanger, an investor group.
The Ringstedt II wind farm (10MW) is located in Landkreis-Cuxhaven (Lower Saxony) and is equipped with five G80-2.0MW turbines. The Gross Hasslow facility (8.5MW) is located in Ostpringnitz-Ruppin (Western Pomerania), comprises 10 G58-850 kW wind turbines. Both facilities were developed and are operated by Gamesa.