New Generation Power Texas (NGP Texas) has signed a contract with GE for the supply of 235 GE 1.7-103wind turbines and related services for their 400MW Texas Wind Project.
Construction began in December 2013 and will be built out over two phases. The 400MW Texas Wind Project is expected to be fully operational before the end of 2015 to qualify for PTC.