Celsia Colombia, an electricity producer and distributor, has ordered 63 N155 turbines with a total of 369 MW for three projects. The orders also include a service contract for maintenance of the turbines for a period of five years with an option to extend by a further five years.
The Acacia II and Camelias wind farms will be built in the Guajira region, and the Carreto project in Atlantico, all of them in the north of Colombia. Two N155/4.8 turbines are to be used in the Carreto wind farm, 16 N155/5.X in Acacia II and 45 N155/5.X machines in Camelias. Installation is due to commence as of spring 2023. The 63 turbines will be installed on concrete towers with a hub height of 120 metres, which will be manufactured locally by the Nordex Group.