Pattern Energy Group has announced that it has erected the first wind turbine at its El Arrayan wind project, a 115MW project located on the coast of Chile, near Ovalle.
Pattern also announced it has passed the mid-point of overall construction at South Kent Wind, its 270MW project in the municipality of Chatham-Kent in southern Ontario and has erected 50 turbines on the site. The South Kent project is expected to reach commercial operation in April of 2014. El Arrayan is expected to be operational in June of 2014.