Peikko Norge has received an order to deliver rock foundation technology to Geitfjellet, Harbaksfjellet and Kvenndalsfjellet wind parks in the Sør-Trøndelag area, Central Norway. Peikko will deliver all steel components for the 100 foundations of the wind parks.
The deliveries comprise FATBAR Rock Anchors, tower adapter plates with tower connection bolts, drilling templates and an assembling system, and special reinforcement steel technology. Peikko is also responsible for the foundation design and structural calculations. Deliveries are scheduled to take place between April and November 2019. The wind parks are estimated to be operational by the end of 2020. The wind parks are part of the Fosen Vind wind power project which is a wind power project, consisting of six wind farms with a combined capacity of 1,057MW. Peikko has already participated in the Fosen Vind project by delivering altogether 177 rock foundations to Roan, Storheia and Hitra 2 wind parks. The developer and future owner of the wind parks is Fosen Vind, a joint venture between the Norwegian TrønderEnergi and Statkraft, and Nordic Wind Power. The project will be executed by Statkraft.