Quadran Brasil has placed an order for the 206MW Serrote wind park to be located at the municipality of Trairí, in the state of Ceará. The contract includes the supply and installation of Vestas 49 V150-4.2 MW wind turbines with a 125-meter hub height.
The power from Serrote wind park will be supplied to the Brazilian utility CEMIG through a PPA agreement with Quadran. Turbine delivery is expected to commence in 2020 and commissioning is planned for 2021.