SeaRenergy Offshore has been selected by Siemens for the transportation and installation of two HVDC converter platforms for the offshore wind cluster BorWin 2 and HelWin 1 in the North Sea.
The platforms which consist of a base frame and a topside shall be towed from Nordic Yards in Wismar and Warnemünde to the designated sites in the North Sea. The company will install the converter platform BorWin 2 about 125 kilometres off the coast, northwest of the island of Borkum, in a water depth of about 40 meters. BorWin 2 will be connected to the wind farms Veja Mate and Global Tech 1, which will have a combined power generating capacity of 800MW. The converter platform HelWin 1 will be installed about 85 kilometres off the coast, northwest of the island of Helgoland, in a water depth of about 23 meters. HelWin 1 will be connected to the wind farm Nordsee Ost and Meerwind, which will have a combined power generating capacity of 576MW. The transport and installation of both platforms shall take place in 2013.
The platforms which consist of a base frame and a topside shall be towed from Nordic Yards in Wismar and Warnemünde to the designated sites in the North Sea. The company will install the converter platform BorWin 2 about 125 kilometres off the coast, northwest of the island of Borkum, in a water depth of about 40 meters. BorWin 2 will be connected to the wind farms Veja Mate and Global Tech 1, which will have a combined power generating capacity of 800MW. The converter platform HelWin 1 will be installed about 85 kilometres off the coast, northwest of the island of Helgoland, in a water depth of about 23 meters. HelWin 1 will be connected to the wind farm Nordsee Ost and Meerwind, which will have a combined power generating capacity of 576MW. The transport and installation of both platforms shall take place in 2013.