Tekmar Energy has completed the delivery of TekLink cable protection systems to DEME Offshore for the SeaMade Offshore Wind Farm in Belgium. SeaMade is a 487MW offshore wind farm currently under construction off the coast of Belgium and integrates two windfarm sites known as Mermaid and Seastar.
Tekmar Energy was awarded a contract to supply 136 patented TekLink Mechanical Latch cable protection systems and bellmouths for application on both J-Tube and J-Tubeless inter-array cable pull-ins. The systems were delivered in January 2020 from the company’s manufacturing facility in Newton Aycliffe UK. Engineering and design verification was performed by Tekmar Group Company, AgileTek Engineering from their offices in London, UK.